Projects: 2009

Please take a look at some of the most recent projects we have worked on in the past year. Included in each job is a listing of the work performed at each site.

Project Woodbridge Street and Parker Street Intersection Improvements
Location Manchester, CT
Contractor Town of Manchester
Year 2009
Work Done

The construction of pedestrian safety improvements at the intersection of Parker and Woodbridge Street.

Installation of:

  • concrete sidewalk,
  • precast concrete curbing,
  • bituminous concrete pavement.
  • storm drains and catch basins
  • pavement markings,
  • turf establishment,
  • traffic signs.
Project Middletown Recycling Center
Location Middletown, CT
Contractor Garofalo & Saraceno
Year 2009
Work Done

Supplied all materials and labor to construct steel storage facility at the Middletown Transfer Station, including the installation of all walk doors and commercial overhead doors.

Project Huntington Street Sidewalk Project
Location Shelton, CT
Contractor City of Shelton
Year 2009
Work Done

Installation of:

  • 4,400 linear feet of sidewalk,
  • precast concrete curbing,
  • culvert extensions,
  • catch basins,
  • reinforced concrete piping (RCP)
  • retaining wall system,
  • concrete handicap ramps (ADA compliant).
Project White Plains Road Streetscape Project
Location Trumbull, CT
Contractor Town of Trumbull
Year 2009
Work Done

Replacement of existing sidewalks and curbing with custom paving stones and precast concrete, catch basin modification and installation on White Plains Road and Daniels Farm Road.

Project Cromwell High School
Location Cromwell, CT
Contractor Garofalo & Saraceno
Year 2009
Work Done

Supplied materials and labor to construct a steel storage facility at the Cromwell High School, including the installation of walk doors and commercial overhead doors.

References available upon request.